Assured EICR Testing provides Electrical Installation Condition Reports (EICRs) and fixed wire testing for commercial, residential and industrial properties throughout the UK.

Our projects cover large commercial premises, warehouse facilities, corporate offices, rental property portfolios and multi-site businesses. We identify electrical installation defects and provide detailed reports outlining electrical safety concerns and recommended remedial actions.

Warehouse EICR Testing at a National Distribution Centre in Warrington

Project: Large-scale warehouse electrical safety inspection

Customer: Philip Greaves

Company: Northway Distribution Services

Location: Warrington, Cheshire

Property Size: 32,000m²

Distribution Boards: 28

Electrical Circuits: 416

Project Value: £8,750

Project Duration: 8 working days

Services: Warehouse EICR and fixed wire testing

The Customer's Requirements

Northway Distribution Services required a periodic electrical inspection across its national distribution centre in Warrington.

The warehouse operated twenty-four hours a day and accommodated approximately 320 employees across multiple shifts.

The electrical installation supported automated conveyor systems, warehouse lighting, loading bays, packaging machinery, office accommodation and staff welfare facilities.

The customer required a comprehensive EICR without unnecessarily interrupting warehouse operations.

Electrical Installation Assessment

Assured EICR Testing reviewed the existing electrical installation records, distribution board schedules and previous inspection reports.

The inspection covered:

  • Twenty-eight electrical distribution boards

  • Four hundred and sixteen electrical circuits

  • Three-phase electrical supplies

  • Warehouse lighting circuits

  • Fixed machinery supply circuits

  • Loading bay electrical installations

  • Office power and lighting circuits

  • Staff welfare facilities

  • Earthing and protective bonding arrangements

The inspection team agreed suitable isolation periods with the warehouse operations manager before testing commenced.

Warehouse Fixed Wire Testing

The electrical inspection included visual examinations and appropriate electrical tests in accordance with BS 7671.

Testing included:

  • Continuity of protective conductors

  • Insulation resistance testing

  • Polarity verification

  • Earth fault loop impedance testing

  • RCD operation testing where applicable

  • Protective device assessments

  • Distribution board inspections

The engineers recorded test results against individual circuit references to simplify future electrical maintenance.

Electrical Inspection Findings

The inspection identified eighteen electrical observations:

  • Five C2 observations involving potentially dangerous electrical conditions

  • Eleven C3 observations recommending improvements

  • Two FI observations requiring further investigation

The C2 observations included damaged electrical accessories, inadequate enclosure protection and deficiencies in protective earthing arrangements.

The initial EICR received an unsatisfactory assessment because C2 and FI observations required further attention.

Coordinating Electrical Remedial Actions

Assured EICR Testing provided the customer with a detailed schedule of electrical observations, classification codes and recommended actions.

The warehouse management team arranged the necessary remedial works and further investigations with its electrical maintenance contractor.

Supporting documentation confirmed that the identified C2 and FI observations had been addressed.

Minimising Warehouse Disruption

The inspection programme incorporated phased electrical isolation during quieter operational periods.

Individual distribution boards were inspected and tested according to the agreed schedule, reducing disruption to warehouse lighting, conveyor equipment and distribution activities.

The Outcome

Northway Distribution Services received a comprehensive assessment of its warehouse electrical installation.

The completed project delivered:

  • Inspection and testing of 416 electrical circuits

  • Assessment of 28 distribution boards

  • Identification of eighteen electrical observations

  • Detailed electrical test result schedules

  • Prioritised remedial recommendations

  • Documentation supporting future electrical maintenance

  • Completion within the agreed operational schedule

The inspection programme was completed within eight working days and the agreed £8,750 budget, excluding remedial works.

Project Takeaway: Warehouse EICR testing supports electrical safety management because detailed circuit inspections identify potentially dangerous electrical conditions within large operational facilities.

Commercial EICR Testing Across a National Retail Portfolio

Project: Multi-site commercial electrical inspection programme

Customer: Louise Kershaw

Company: Fairmont Retail Holdings

Location: Manchester, Liverpool, Leeds, Sheffield and Nottingham

Number of Properties: 18

Combined Floor Area: 24,600m²

Distribution Boards: 54

Electrical Circuits: 768

Project Value: £16,850

Project Duration: 18 working days

Services: Commercial EICR and fixed wire testing

The Customer's Requirements

Fairmont Retail Holdings operated eighteen commercial retail premises across northern England and the Midlands.

The properties included high street stores, retail park units and larger flagship premises.

Electrical inspection records varied between locations, with several properties approaching their recommended periodic inspection dates.

The customer required a coordinated inspection programme to establish the condition of its electrical installations and improve consistency across its property portfolio.

Commercial Electrical Inspection Planning

Assured EICR Testing developed an inspection schedule covering all eighteen retail properties.

The team reviewed existing electrical documentation and coordinated access with individual store managers.

The electrical inspections covered:

  • Retail lighting installations

  • Display lighting circuits

  • Socket outlet circuits

  • Fixed heating and ventilation supplies

  • Distribution boards

  • External electrical installations

  • Staff accommodation circuits

  • Storage and stockroom electrical supplies

Inspection appointments were arranged outside normal trading hours where practical.

Fixed Wire Testing Across the Retail Portfolio

The inspection programme covered 768 electrical circuits across 54 distribution boards.

Electrical engineers assessed the condition of fixed wiring, protective devices, electrical accessories and earthing arrangements.

Each retail property received individual inspection schedules and recorded electrical test results.

Electrical Safety Observations

The eighteen property inspections produced the following initial results:

  • Twelve satisfactory EICRs

  • Six unsatisfactory EICRs

  • Nine C2 observations

  • Twenty-seven C3 observations

  • Three FI observations

The identified concerns included damaged socket outlets, inappropriate protective device arrangements, deteriorated electrical accessories and circuits requiring further investigation.

The reports distinguished potentially dangerous conditions from recommended improvements.

Centralised Electrical Compliance Reporting

Assured EICR Testing provided individual property reports alongside a consolidated summary of inspection outcomes.

The centralised records allowed the customer's facilities management department to identify:

  • Properties requiring remedial attention

  • Electrical observations requiring prioritisation

  • Recommended installation improvements

  • Distribution board and circuit references

  • Recommended future inspection dates

The customer arranged remedial works for the affected properties using the inspection findings.

The Outcome

Fairmont Retail Holdings received a coordinated electrical condition assessment across eighteen commercial properties.

The completed programme delivered:

  • Eighteen Electrical Installation Condition Reports

  • Inspection and testing of 768 electrical circuits

  • Assessment of 54 distribution boards

  • Identification of thirty-nine electrical observations

  • Centralised electrical inspection records

  • Prioritised remedial recommendations

  • Improved visibility of electrical installation conditions

The programme was completed within eighteen working days and the agreed £16,850 inspection budget.

Project Takeaway: Multi-site commercial EICR testing simplifies electrical compliance management because standardised reporting allows property managers to monitor inspection outcomes across multiple premises.

Landlord EICR Testing Across a Portfolio of 120 Rental Properties

Project: Residential rental property electrical inspection programme

Customer: Martin Forshaw

Company: Alderbank Residential Lettings

Location: Greater Manchester, Cheshire and Lancashire

Number of Properties: 120

Electrical Circuits: 1,080

Project Value: £21,600

Project Duration: 35 working days

Services: Landlord EICR and fixed wire testing

The Customer's Requirements

Alderbank Residential Lettings managed a portfolio of 120 privately rented residential properties.

The portfolio incorporated apartments, terraced houses, semi-detached properties and larger detached homes.

Several existing electrical inspection reports were approaching their expiry dates, while newly acquired properties required updated electrical condition assessments.

The customer wanted a coordinated inspection programme supporting its obligations under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020.

Residential Property Inspection Programme

Assured EICR Testing coordinated inspection appointments with the letting agency, property managers and tenants.

The portfolio included:

  • Forty-eight apartments

  • Thirty-six terraced houses

  • Twenty-four semi-detached houses

  • Twelve detached houses

Each property received an individual electrical installation assessment based on its existing wiring configuration and agreed inspection scope.

Landlord Electrical Safety Testing

The electrical inspections covered relevant fixed installations, including:

  • Consumer units

  • Lighting circuits

  • Socket outlet circuits

  • Electric shower supplies

  • Cooker circuits

  • Fixed heating supplies

  • Earthing arrangements

  • Protective bonding connections

  • RCD protection

The engineers assessed the condition of accessible electrical installations and recorded appropriate electrical test results.

Any agreed inspection limitations were documented within the individual reports.

Electrical Inspection Findings

The initial inspection programme produced:

  • Ninety-four satisfactory EICRs

  • Twenty-six unsatisfactory EICRs

  • Thirty-eight C2 observations

  • Sixty-four C3 observations

  • Seven FI observations

Common observations included damaged electrical accessories, missing protective bonding and electrical circuits requiring further investigation.

The inspection reports clearly identified which properties required further action.

Landlord Electrical Remedial Coordination

Assured EICR Testing provided the letting agency with individual reports and recommended remedial actions.

The letting agency arranged the necessary electrical repairs and investigations through its maintenance contractors.

For properties requiring remedial work or further investigation, the agency coordinated completion within the applicable statutory timeframe or any shorter period specified in the report.

Written confirmation of the completed works supported the landlord's electrical safety records.

Tenant Access and Appointment Management

The inspection programme was organised geographically to improve scheduling efficiency.

Tenants received advance appointment arrangements through the letting agency.

The coordinated approach reduced unnecessary repeat visits and helped the agency maintain oversight of outstanding inspections.

The Outcome

Alderbank Residential Lettings received updated electrical condition assessments across its entire rental property portfolio.

The completed programme delivered:

  • One hundred and twenty Electrical Installation Condition Reports

  • Inspection and testing of 1,080 electrical circuits

  • Identification of 109 electrical observations

  • Clear remedial action schedules

  • Individual property electrical inspection records

  • Recommended future inspection dates

  • Improved oversight of landlord electrical safety obligations

The inspection programme was completed within thirty-five working days at an average inspection cost of £180 per property.

Project Takeaway: Landlord EICR programmes support rental property electrical safety obligations because individual inspection reports identify defects and document the condition of each property's fixed electrical installation.

Office EICR Testing at a Corporate Headquarters in Birmingham

Project: Multi-floor office electrical inspection and testing

Customer: Rebecca Stonehouse

Company: Mercian Professional Services Group

Location: Birmingham, West Midlands

Property Size: 14,800m²

Number of Floors: 8

Number of Employees: 620

Distribution Boards: 36

Electrical Circuits: 528

Project Value: £10,560

Project Duration: 10 working days

Services: Office EICR, commercial EICR and fixed wire testing

The Customer's Requirements

Mercian Professional Services Group required a periodic electrical installation inspection across its eight-storey corporate headquarters.

The building accommodated open-plan offices, executive meeting rooms, training facilities, server rooms and staff welfare areas.

The organisation relied heavily on its electrical infrastructure to maintain daily business operations.

The customer required an inspection programme that minimised disruption to employees, computer equipment and internal communication systems.

Office Electrical Installation Assessment

Assured EICR Testing reviewed available electrical distribution diagrams, existing inspection records and circuit schedules.

The inspection covered:

  • Thirty-six electrical distribution boards

  • Five hundred and twenty-eight electrical circuits

  • Office socket outlet installations

  • Lighting circuits

  • Floor box electrical supplies

  • Meeting room electrical installations

  • Fixed air conditioning supplies

  • Server room electrical supply circuits

  • Kitchen and welfare facility circuits

Special access and isolation arrangements were agreed for business-critical electrical supplies.

Out-of-Hours Fixed Wire Testing

The electrical inspection programme incorporated evening and weekend appointments.

Engineers completed visual inspections and appropriate electrical tests according to the agreed circuit isolation schedule.

The testing programme included continuity, insulation resistance, polarity, earth fault loop impedance and relevant protective device testing.

Any circuits that could not be safely isolated were documented as inspection limitations and scheduled for further attention where required.

Electrical Inspection Findings

The inspection identified twenty-nine electrical observations:

  • Seven C2 observations

  • Eighteen C3 observations

  • Four FI observations

The potentially dangerous conditions included damaged floor box accessories, inadequate electrical enclosure protection and deficiencies in protective conductor continuity.

The initial EICR received an unsatisfactory assessment.

Electrical Reporting and Remedial Recommendations

Assured EICR Testing issued a detailed report identifying the locations, circuit references and classifications of the electrical observations.

The facilities management team used the report to coordinate remedial works with its appointed electrical contractor.

Further investigations were arranged for the circuits identified within the FI observations.

Recommended C3 improvements were incorporated into the building's longer-term electrical maintenance programme.

The Outcome

Mercian Professional Services Group received a comprehensive electrical condition assessment covering its corporate headquarters.

The completed project delivered:

  • Assessment of 528 electrical circuits

  • Inspection of 36 distribution boards

  • Identification of twenty-nine electrical observations

  • Detailed electrical test result schedules

  • Prioritised electrical remedial recommendations

  • Documented inspection limitations

  • Reduced disruption to normal office operations

The project was completed within ten working days and the agreed £10,560 inspection budget.

Project Takeaway: Out-of-hours office EICR testing reduces operational disruption because electrical inspections and circuit isolation can take place outside normal employee working hours.

Industrial Fixed Wire Testing at a Manufacturing Facility in Sheffield

Project: Large-scale industrial electrical condition assessment

Customer: Andrew Millington

Company: Millington Precision Engineering

Location: Sheffield, South Yorkshire

Property Size: 26,500m²

Distribution Boards: 42

Electrical Circuits: 684

Project Value: £15,390

Project Duration: 14 working days

Services: Fixed wire testing and commercial EICR

The Customer's Requirements

Millington Precision Engineering operated a large manufacturing facility incorporating production workshops, CNC machining areas, assembly departments and administrative offices.

The electrical installation supported three-phase machinery supplies, extraction systems, compressors, industrial lighting and general electrical equipment.

The customer required a detailed electrical condition assessment to identify deterioration, installation defects and potentially dangerous electrical conditions.

The inspection needed to accommodate continuous manufacturing operations and planned production shutdowns.

Industrial Electrical Installation Assessment

Assured EICR Testing reviewed the existing electrical distribution infrastructure and agreed the inspection scope with the site's engineering department.

The inspection incorporated:

  • Forty-two distribution boards

  • Six hundred and eighty-four electrical circuits

  • Three-phase distribution systems

  • Fixed machinery supply circuits

  • Industrial socket outlets

  • Lighting installations

  • Compressor supply circuits

  • Extraction system electrical supplies

  • Protective earthing arrangements

The inspection covered the fixed electrical installation supplying machinery rather than the internal electrical systems of the machinery itself.

Industrial Electrical Testing

The inspection team completed appropriate electrical tests using calibrated instruments.

The testing programme assessed:

  • Protective conductor continuity

  • Insulation resistance

  • Circuit polarity

  • Earth fault loop impedance

  • RCD operation where applicable

  • Protective device suitability

  • Electrical connection conditions

  • Distribution equipment condition

Visual inspections also assessed accessible wiring, enclosure protection, evidence of deterioration and signs of overheating.

Electrical Condition Report Findings

The inspection identified forty-seven electrical observations:

  • Twelve C2 observations

  • Twenty-nine C3 observations

  • Six FI observations

The potentially dangerous conditions included deteriorated electrical enclosures, damaged protective conductors and inadequate protection against access to live components.

The FI observations identified electrical circuits requiring additional investigation before their condition could be established.

The initial inspection resulted in an unsatisfactory EICR.

Production Shutdown Coordination

Assured EICR Testing coordinated circuit isolation with the manufacturing facility's engineering and production managers.

Selected inspections took place during planned maintenance shutdowns, evening periods and weekends.

The phased approach allowed individual production departments to remain operational wherever safe and practical.

Industrial Electrical Remedial Planning

The manufacturing company received a detailed observation schedule identifying the affected electrical circuits and recommended actions.

The site's electrical maintenance contractor arranged corrective works and further investigations according to the report findings.

The customer incorporated recommended C3 improvements into its planned preventative maintenance programme.

The Outcome

Millington Precision Engineering received a detailed assessment of its industrial electrical infrastructure.

The completed project delivered:

  • Inspection and testing of 684 electrical circuits

  • Assessment of 42 distribution boards

  • Identification of forty-seven electrical observations

  • Recorded electrical test results

  • Prioritised electrical remedial recommendations

  • Improved electrical maintenance documentation

  • Coordinated testing around manufacturing operations

The inspection programme was completed within fourteen working days and the agreed £15,390 budget.

Project Takeaway: Industrial fixed wire testing supports preventative electrical maintenance because inspection reports identify deterioration and electrical defects that require corrective action.

Commercial EICR Testing Across a Multi-Site Hotel Group

Project: Electrical condition assessment across operational hospitality properties

Customer: Catherine Latham

Company: Latham Hotels and Resorts

Location: Chester, York, Bath, Bristol, Oxford and Cambridge

Number of Hotels: 6

Combined Number of Guest Rooms: 840

Distribution Boards: 96

Electrical Circuits: 1,440

Project Value: £28,800

Project Duration: 24 working days

Services: Commercial EICR and fixed wire testing

The Customer's Requirements

Latham Hotels and Resorts operated six commercial hotels incorporating guest accommodation, conference facilities, restaurants, kitchens and leisure areas.

The group required updated electrical inspection records across all six properties.

The customer wanted a consistent inspection programme that accommodated guest occupancy, hospitality operations and scheduled corporate events.

Hotel Electrical Installation Assessment

Assured EICR Testing reviewed the electrical infrastructure within each property.

The inspection covered agreed fixed electrical installations serving:

  • Guest bedrooms

  • Reception areas

  • Commercial kitchens

  • Restaurants and bars

  • Conference facilities

  • Laundry rooms

  • Plant rooms

  • Staff accommodation

  • Communal lighting circuits

  • External electrical installations

Each hotel received an inspection schedule tailored to its operational requirements and electrical distribution arrangements.

Multi-Site Fixed Wire Testing

The programme incorporated inspection and testing of 1,440 electrical circuits across ninety-six distribution boards.

Electrical engineers recorded circuit-specific test results and assessed accessible electrical equipment for damage, deterioration and potentially dangerous installation conditions.

The inspection team coordinated bedroom access with housekeeping departments and electrical isolation with individual hotel maintenance managers.

Electrical Inspection Findings

The initial inspection programme produced:

  • Two satisfactory EICRs

  • Four unsatisfactory EICRs

  • Fourteen C2 observations

  • Forty-two C3 observations

  • Eight FI observations

The identified concerns included damaged electrical accessories, deficiencies in electrical enclosure protection and deteriorated wiring requiring additional assessment.

The reports identified recommended remedial actions according to the classification of each observation.

Centralised Hotel Electrical Reporting

Assured EICR Testing provided the hotel group's management team with six individual Electrical Installation Condition Reports.

A consolidated inspection summary helped the management team allocate electrical maintenance budgets and prioritise corrective works.

The customer arranged the required remedial works and further investigations through its appointed electrical contractors.

Maintaining Hotel Operations

The inspection programme was coordinated around room vacancies, kitchen operating hours and conference bookings.

Electrical circuits were isolated in agreed phases to minimise disruption to guest accommodation and hospitality services.

Individual inspection limitations were recorded where operational restrictions prevented complete testing.

The Outcome

Latham Hotels and Resorts received a comprehensive electrical condition assessment across six hospitality properties.

The completed programme delivered:

  • Six Electrical Installation Condition Reports

  • Assessment of 1,440 electrical circuits

  • Inspection of ninety-six distribution boards

  • Identification of sixty-four electrical observations

  • Centralised electrical maintenance records

  • Prioritised recommendations for corrective works

  • Recommended future inspection dates

  • Coordinated testing around hotel operations

The inspection programme was completed within twenty-four working days and the agreed £28,800 budget, excluding remedial works.

Project Takeaway: Multi-site hotel EICR testing supports consistent electrical safety management because individual property reports allow hospitality groups to identify defects and prioritise electrical maintenance across their estates.

Contact Assured EICR Testing

Assured EICR Testing delivers commercial EICRs, landlord EICRs, office EICRs, warehouse electrical inspections and fixed wire testing throughout the UK.

Our team provides detailed electrical condition reports for individual properties, large industrial facilities and nationwide property portfolios.

Contact us today to discuss your electrical inspection and testing requirements.

Get in Touch

We aim to get back to you in 1 working day.


Skip to

Privacy Information

Social Links

Contact

Assured EICR Testing
Trading style of HT PAT Testing Ltd
Unit D11 Falcon Business Centre
Victoria Street
Chadderton
Oldham
OL9 0HB

Assured EICR Testing is a trading style of HT PAT Testing Ltd, registered in England & Wales (company no: 11902414)